Arlington County Board Approves Updated Master Plan for Long Bridge Park

  • Re-affirms vision for premier park, aquatics and fitness facility
  • Relocates aquatics facility to site’s north end  
  • Provides more  space for picnics, events, play areas and rain gardens

ARLINGTON, VAThe Arlington County Board today approved the updated Master Plan for Long Bridge Park in Crystal City, and four additional procedural measures that move the project toward completion.

“Our actions today move us closer to realizing the dream of transforming a former brown field into one of the region’s most dynamic parks, recreation and athletic facilities in one of its most beautiful natural settings,” said Arlington County Board Chairman J. Walter Tejada. “Long Bridge Park’s fields, views and esplanade already serve thousands of Arlingtonians. Soon, many more also will be able to swim, play indoor sports or exercise year-round in this unique park.”

Aquatics Center relocated

The Board voted unanimously to adopt the revision of the 2004 North Tract (now known as Long Bridge Park) Master Plan for Park and Recreation Facilities. The 2004 plan was revised as the result of a 2005 land exchange between the County and Monument Realty.

The most critical change was the relocation of the Aquatics, Health & Fitness Facility to the north end of the site. The relocation made it possible to greatly improve the park’s overall layout. On-site parking now will be more centrally located, and Long Bridge Drive will be reconstructed at its original location, rather than be relocated as envisioned in the 2004 Master Plan.

More room for picnics, events, play areas and rain gardens

These changes, coupled with the addition of two acres as a result of the 2005 land swap, made it possible to reposition two of the athletic fields. This created more space for picnic lawns, event spaces, play areas and rain gardens.

The other major change to the 2004 Master Plan was the addition of the esplanade, the wide, elevated promenade along the east side of the park adjacent to the railroad right-of-way. The esplanade is the park’s unifying element, and it provides pedestrian and bicycle access from Crystal City to the Mount Vernon Trail and routes to the District of Columbia.  The Esplanade provides panoramic views of park activities, trains, planes, wildlife in Roaches Run, and national monuments. It also functions as a secure repository for remediated soil, thus avoiding the costs of removing contaminated materials offsite. The plan is now for it to run from Crystal Drive to the new facility entrance.

The Board directed the County Manager to ensure the park’s infrastructure and programming can support large events. The County Manager will also explore the viability of offering handball at the facility.

Core uses retained

The major outdoor and indoor elements remain as in the original Master Plan. Four full-size, synthetic, lighted athletic fields, three of which opened in November 2011, remain the outdoor park’s centerpiece. The fields are supported by restrooms, storage buildings, sidewalks and park furnishings. Additional public art will be integrated into the design next to the aquatics facility.

50-meter pool, exercise rooms and much more planned for indoor facility

The new Master Plan retains the 50-meter pool; teaching pool; therapy pool; leisure pool; community and group exercise rooms; health and fitness spaces; multiple activity center; racquetball/squash courts; climbing wall; indoor jogging track; and support spaces included in the 2004 Master Plan. Space allocated to fitness activities, including classes and individual workouts, has been expanded in order to increase revenues and improve cost recovery.

Facility to achieve LEED Silver certification

The revised Master Plan requires the Aquatics, Health & Fitness Facility to achieve LEED (Leadership in Energy and Environmental Design) Sliver certification, with additional emphasis on energy efficiency. This is in keeping with the County’s current policies on sustainable design and energy conservation. The facility’s heating and cooling systems will be designed to meet or exceed the Community Energy Plan’s emission reduction goals.

Multi-phase development

The Master Plan outlines development in five phases. Phase 1, containing much of the infrastructure upon which the rest of the park will be built, was finished in November 2011. Phase 2, beginning development of the north end of the park, including the initial phase of the Aquatics, Health & Fitness Facility, will begin by the end of 2013. Read the details of each planned phase on the County website.

Transportation improvements

Full realization of the updated Master Plan also involves transportation improvements that depend on planning, design and funding decisions by other parties such as VDOT, the National Park Service, the Federal Highway Administration, and CSX. These improvements include:

  • Redesign of the intersection of Boundary Channel Drive, Long Bridge Drive and I-395 to improve safety, rationalize ramps and accommodate bicycle lanes and links.
  • Construction of a bicycle/pedestrian bridge over the George Washington Memorial Parkway.
  • Improvement of pedestrian/bicycle facilities crossing the Potomac River.
  • Future transit service for the Route One/Long Bridge corridor that includes stops serving the park.

The County Board also directed staff to improve the pedestrian and transit relationship between Long Bridge Drive and the entrance to the Aquatics, Health & Fitness Facility.

Additional park development approved

In related votes, the County Board also approved:

  1. A General Land Use Plan Amendment from "Low" Office-Apartment-Hotel and "Medium" Residential to "Public for the area around the park. (Unanimous vote.)
  2. A Rezoning from Commercial Office Building, Hotel and Apartment Districts and Service Industrial Districts to Public Service Districts. (Unanimous vote.)
  3. A Use Permit for the Aquatics, Health & Fitness Facility with modification to parking regulations for reduction in required parking ratio, location of spaces off site and on-street. (Note: The vote for this agenda item was 4 to 1.)
  4. A Certification of Transferrable Development Rights by the Arlington County Board, for the purpose of creating open space and developing community recreation and/or community facilities for the park. (Unanimous vote.)

 

Arlington, Va., is a world-class residential, business and tourist location that was originally part of the "10 miles square" parcel of land surveyed in 1791 to be the Nation's Capital. It is the geographically smallest self-governing county in the United States, occupying slightly less than 26 square miles. Arlington maintains a rich variety of stable neighborhoods, quality schools and enlightened land use, and received the Environmental Protection Agency's highest award for "Smart Growth" in 2002. Home to some of the most influential organizations in the world - including the Pentagon - Arlington stands out as one of America's preeminent places to live, visit and do business.

Media Contacts

Susan Kalish